Michigan demolition planning guide

Demolition Utility Disconnects and MISS DIG 811

Locates, disconnects, and private facilities are related but not interchangeable.

Project details stay connected from the first review through the final site condition.

(734) 476-1098
Plan the next conversation

Use the guide below to organize questions, then confirm the details for the actual property and scope.

Explore demolition services
Use this as a planning guide

Utility planning should begin before demolition or excavation. MISS DIG 811 provides a Michigan process for locating participating public facilities, while disconnect coordination and private-facility locating may be separate responsibilities.

This page is general educational information, not an address-specific permit, legal, environmental, engineering, or utility determination.

Planning steps
01
Identify known services

List visible meters, lines, equipment, and information from the owner or utility.

02
Request locating as appropriate

Use the official MISS DIG 811 process before digging and follow its current instructions.

03
Confirm remaining responsibilities

Coordinate required disconnects and ask whether private facilities need separate locating.

Confirm the details for the property

MISS DIG 811 is not a demolition authorization, a utility disconnect, or a complete private-facility survey. Follow current official guidance and the utility’s instructions for the project.

Separate locating, disconnects, and private facilities

Utility planning starts with an inventory of what may serve the property. Look for meters, overhead services, tanks, panels, exterior equipment, visible lines, and information from the owner or utility. The inventory is a question list, not proof that every facility has been identified. Record what is known, what is uncertain, and which party is expected to confirm it. This is especially important when a structure is vacant, has changed use, or has additions whose services may not be obvious from the main building.

MISS DIG 811 and utility disconnect coordination address different parts of the planning problem. A locate request follows the current official process for participating public facilities before digging. A disconnect is an instruction or service decision made with the relevant utility. Private facilities on a property may require a separate locating approach. Treating these as interchangeable can leave a gap between a locate mark, an inactive account, and a line or system that still needs attention.

Ask each responsible party what confirmation is needed and keep the responses with the project record. Note the request date, ticket or reference information when provided, utility contacts, disconnect status, private-facility questions, and any limits described by the source. Recheck the process if the work moves from building removal to excavation or if the scope changes. Official instructions and property conditions should control the next step rather than a general statement on a webpage.

On the site, the utility plan should remain visible to everyone coordinating the work. Marked facilities, known service points, retained systems, and areas that still need confirmation should not be left only in one person’s notes. If an unexpected line, meter, odor, connection, or other condition appears, stop and escalate the question through the responsible channel. Demolition planning is safer when uncertainty is treated as a reason to verify, not as permission to continue.

Before the work area is released, assemble a utility packet that separates what is known from what is still pending. Include the current locate information, utility responses, disconnect status, private-facility questions, visible service photographs, and a simple site sketch. Give the packet to the people coordinating access and loading, and identify who can answer a new field question. The packet should not be treated as permanent proof that conditions cannot change. It is a shared starting point that needs to be revisited if the scope moves into a new area, the property changes, or a line or service is discovered. A clear stop-and-confirm instruction is valuable: if an unexpected utility condition appears, identify the affected area, keep people and equipment clear, and contact the responsible channel before deciding how to continue. That approach keeps locate information, disconnect decisions, and private-facility questions from collapsing into one vague assumption.

The most useful utility note is not the longest one; it is the one that shows the status of each question. Label items as identified, locate requested, response received, disconnect confirmed, private facility pending, or requires field verification. Share that status with the people controlling the work area and update it when the scope changes. If a source gives limits or exclusions, preserve those words in the record. This makes it harder for a locate request to be remembered later as a broad guarantee that every facility has been disconnected or identified.

01
Inventory visible services

Photograph and list meters, panels, overhead lines, equipment, tanks, and known connections. Mark uncertain items so they receive a deliberate answer instead of disappearing from the scope.

02
Use the official locate process

Follow current MISS DIG 811 instructions for the work and timing. Keep the request information, but remember that a locate is not a disconnect or a complete private-facility survey.

03
Confirm disconnect duties

Ask the relevant utilities what must be requested, by whom, and when. Track disconnect status separately from locate status and from any private-line locating question.

04
Escalate unexpected conditions

If a line, connection, or service condition is not understood, pause the affected work and seek direction. Do not convert an incomplete inventory into an assumption that the area is clear.

Questions to carry into the review
Does MISS DIG 811 disconnect utilities?

No. Locating participating public facilities and arranging a disconnect are different tasks.

Are private lines covered by a public locate request?

Private facilities may require separate locating. Confirm the current process for the property.

When should utility planning happen?

Before demolition or excavation is scheduled, with enough time to follow current official and utility instructions.

Does a MISS DIG 811 request disconnect a utility?

No. Locating participating public facilities and arranging a utility disconnect are different responsibilities. Confirm both steps with the current official process and the relevant utility.

Why can private utility locating require additional planning?

Public locate systems may not identify every privately owned facility on a property. Ask who can address private lines or systems for the particular site before demolition or excavation is planned.